The Assistant Director for
Planning:
- advised that permission was
sought for partial demolition of an existing building including
retention of its front façade and an extension to form 41
self-contained residential apartments with shared kitchen and
lounge facilities, adding 5 dormers to the roof of the
building
- described the location of the
site on the eastern side of Beaumont Fee, occupied by Todson House
with associated outbuildings to the rear, the Pathway Centre to the
south; a three-storey building providing accommodation and support
for homeless and vulnerable adults, and recently completed Iconic
Student Accommodation to the north consisting of a 3-5 storey
development and refurbishment of a former school
building
- reported that the current
application was submitted by Park Lane Group, the same applicant as
the previous development to the north, proposing student
accommodation also managed by Iconic
- confirmed that the site was
situated within the Cathedral and City Centre No.1 Conservation
Area
- added that the existing
building was not listed, although Friends Meeting House, a Grade II
listed building was situated on the opposite side of Beaumont
Fee
- advised that pre-application
discussions had taken place with the applicant/architect involving
other design options considered for the site including full
demolition, although a development which incorporated retention of
the front façade as the main entrance to the building was
considered to be the most appropriate
- provided details of the
history relevant to the site of the proposed development as
detailed within the officer’s report
- provided details of the
policies pertaining to the application, as follows:
- Policy
LP2 The Spatial Strategy and
Settlement Hierarchy
- Policy
LP6 Retail and Town Centres in
Central Lincolnshire
- Policy
LP7 A Sustainable Visitor
Economy
- Policy
LP13 Accessibility and
Transport
- Policy
LP25 The Historic Environment
- Policy
LP26 Design and Amenity
- Policy
LP29 Protecting Lincoln's Setting and
Character
- Policy
LP31 Lincoln's Economy
- Policy
LP33 Lincoln's City Centre Primary
Shopping Area and Central Mixed-Use Area
- National Planning Policy
Framework
- advised Planning Committee of
the main issues to be considered as part of the application to
assess the proposal with regards to:
- National and Local Planning
Policy- The Principle of the Proposed Mixed-Use
Development
·
Assessment of Harm to the Character and Appearance of the
Conservation Area
·
Residential Amenity
·
Archaeology
·
Highways and Drainage
·
Contamination
- outlined the responses made
to the consultation exercise
- concluded that:
- The development would relate
well to the site and surroundings, particularly in relation to
siting, height, scale, massing, and design.
- The proposals would bring a
vacant site back into use with the retention of the front
façade of the building, which would ensure the character and
appearance of the Conservation Area was preserved.
- Technical matters relating to
noise, highways, contamination, archaeology, and drainage were to
the satisfaction of the relevant consultees and could be dealt with
as necessary by condition.
- The proposals would therefore
be in accordance with the requirements of CLLP Policies and the
NPPF.
Planning
Committee discussed the content of the report in further
detail.
The
following comments and questions emerged from members:
·
This
planning application developed well with the one next door and
would bring character to the area.
·
The
retention of the existing frontage to the building although not
protected, would be an added attraction to the area.
·
The
proposed development was in close proximity to the University and
College.
·
The
proposal by the developer to separate the surface and foul water
drainage which currently ran into a combined system was to be
commended.
·
Clarification
of the meaning of a ‘Blue Roof’ referred to within the
officer’s report was requested.
·
Would
the materials from the demolished building be re used?
·
What
type of materials would be used in the construction of the
dormers?
The
Assistant Director of Planning offered the following point of
clarification to members:
·
The
term ‘Blue Roof’ referred to attenuation of rainwater
and a potential reduced run-off rate into the drainage
system.
·
Materials
from the existing build would be re-used wherever possible with the
front elevation remaining in situ.
·
The
dormers would be manufactured of best quality workmanship with use
of appropriate materials to be negotiated.
RESOLVED
that the application for planning permission be granted
subject to the
following conditions:
- Time
limit of the permission
- Development in
accordance with approved plans
- Materials to be
submitted including shade of zinc cladding
- Noise Assessment to be
submitted
- Contaminated
land
- Archaeological WSI and
foundation design
-
Surface water drainage (as required once LLFA has
submitted final comments)
-
Construction of the
development (delivery times and working hours)
-
Highway construction
management plan
-
Existing dropped kerb
to be reinstated