The
Assistant Director for Planning:
- advised that permission was sought for partial demolition of an
existing building including retention of its front façade
and an extension to form 41 self-contained residential apartments
with shared kitchen and lounge facilities, adding 5 dormers to the
roof of the building
- described the location of the site on the eastern side of
Beaumont Fee, occupied by Todson House with associated outbuildings
to the rear, the Pathway Centre to the south; a three-storey
building providing accommodation and support for homeless and
vulnerable adults, and recently completed Iconic Student
Accommodation to the north consisting of a 3-5 storey development
and refurbishment of a former school building
- reported that the current application was submitted by Park Lane
Group, the same applicant as the previous development to the north,
proposing student accommodation also managed by Iconic
- confirmed that the site was situated within the Cathedral and
City Centre No.1 Conservation Area
- added that the existing building was not listed, although
Friends Meeting House, a Grade II listed building was situated on
the opposite side of Beaumont Fee
- advised that pre-application discussions had taken place with
the applicant/architect involving other design options considered
for the site including full demolition, although a development
which incorporated retention of the front façade as the main
entrance to the building was considered to be the most
appropriate
- provided details of the history relevant to the site of the
proposed development as detailed within the officer’s
report
- provided details of the policies pertaining to the application,
as follows:
- Policy LP2 The
Spatial Strategy and Settlement Hierarchy
- Policy LP6 Retail
and Town Centres in Central Lincolnshire
- Policy LP7 A
Sustainable Visitor Economy
- Policy LP13 Accessibility and
Transport
- Policy LP25 The Historic
Environment
- Policy LP26 Design and
Amenity
- Policy LP29 Protecting
Lincoln's Setting and Character
- Policy LP31 Lincoln's
Economy
- Policy LP33 Lincoln's City
Centre Primary Shopping Area and Central Mixed-Use Area
- National Planning Policy Framework
- advised Planning Committee of the main issues to be considered
as part of the application to assess the proposal with regards
to:
- National and Local Planning Policy- The Principle of the
Proposed Mixed-Use Development
·
Assessment of Harm to the Character and Appearance
of the Conservation Area
·
Residential Amenity
·
Archaeology
·
Highways and Drainage
·
Contamination
- outlined the responses made to the consultation
exercise
- concluded that:
- The
development would relate well to the site and surroundings,
particularly in relation to siting, height, scale, massing, and
design.
- The
proposals would bring a vacant site back into use with the
retention of the front façade of the building, which would
ensure the character and appearance of the Conservation Area was
preserved.
- Technical matters relating to noise, highways, contamination,
archaeology, and drainage were to the satisfaction of the relevant
consultees and could be dealt with as necessary by
condition.
- The
proposals would therefore be in accordance with the requirements of
CLLP Policies and the NPPF.
Planning Committee discussed the
content of the report in further detail.
The following comments and
questions emerged from members:
·
This planning
application developed well with the one next door and would bring
character to the area.
·
The retention of the
existing frontage to the building although not protected, would be
an added attraction to the area.
·
The proposed
development was in close proximity to the University and
College.
·
The proposal by the
developer to separate the surface and foul water drainage which
currently ran into a combined system was to be
commended.
·
Clarification of the
meaning of a ‘Blue Roof’ referred to within the
officer’s report was requested.
·
Would the materials
from the demolished building be re used?
·
What type of materials
would be used in the construction of the dormers?
The Assistant Director of Planning
offered the following point of clarification to members:
·
The term ‘Blue
Roof’ referred to attenuation of rainwater and a potential
reduced run-off rate into the drainage system.
·
Materials from the
existing build would be re-used wherever possible with the front
elevation remaining in situ.
·
The dormers would be
manufactured of best quality workmanship with use of appropriate
materials to be negotiated.
RESOLVED that the application for
planning permission be granted subject to
the following
conditions:
Conditions
- Time limit of the
permission
- Development in accordance with approved
plans
- Materials to be submitted including shade of zinc
cladding
- Noise Assessment to be
submitted
- Contaminated land
- Archaeological WSI and foundation
design
- Surface water drainage (as required once LLFA has
submitted final comments)
- Construction of the development
(delivery times and working hours)
- Highway construction management
plan
- Existing dropped kerb to be
reinstated